Reprocessing was successfully performed for the first time in phase E2 in September. A portion of FMB data (28/06/2019(orbit4911)-05/09/2019(orbit6001)) from Level 0 up to L2B was reprocessed.
Successful change to baseline 06
05 sep. 2019
Successful change to baseline 06
05 sep. 2019
Reprocessing was successfully performed for the first time in phase E2 in September. A portion of FMB data (28/06/2019(orbit4911)-05/09/2019(orbit6001)) from Level 0 up to L2B was reprocessed.